Data Center Construction Project Manager - Mission Critical

Data Center Construction Project Manager - Mission Critical| Network | Rocklin, CA, USA

Send to a Friend Print


Responsibilities

  • Manage construction from initial site design through completed drawings including drawing review taking into account civil, structural, mechanical, and electrical feasibility; value engineering, zoning, Phase 1 & 2 environmental  certification, signoff, and change order minimization.  
  • Manage construction activities related to the development of multiple, simultaneous Network infrastructure projects including; RFQ or RFP process, Contract process, Sealed bid , Distributing bid packages, Coordinating bid walk, Awarding project, Monitoring progress, Providing regular status updates, Resolve issues. 
  • Provide solid ownership of project financial results, from initial proposal/bid through receipt of final product or service including project budget funding, adherence to budget spending, creation & tracking purchase orders, inspecting work performed by contractors
  • Provide solid team leadership and direction through practicing Core Values including:  creating and evaluating ways to gain financial efficiencies; creating process improvements; securing assets; and being accountable for vendor payments.
  • Evaluate & implement prudent value engineering in the pursuit of your responsibilities;
    challenging the normal way things are done, with a goal of bettering the way one performs their responsibilities.
  • Interact with peers in a respectful and flexible manner, so as to maintain a positive focus on the achievement of team goals
  • Exhibit the utmost of integrity and respect when leading and directing contractors.
  • Demonstrate professionalism by responding to emails promptly, actively leading & participating in meetings, ability to express & explain issues clearly, providing updates, maintaining records, working with other departments, and understanding the impact of their job to the overall business. 
  • Establishes quality assurance methods, procedures, standards, and technical training related to site design and construction. Evaluates new products, services, and vendors.  Weigh the pros and cons, including impact to the system, costs, compatibility, and ease of use, reliability, and timing parameters. 
  • Interfaces with internal and external departments as well as regulatory agencies by interacting with municipal agencies in the pursuit of building permits, construction inspections, and by finally obtaining certificates of occupancy for network facilities. 
  • Coordinate & direct the team skills to successfully represent the company at municipal zoning hearings.


Qualifications

Education:

  • Associate’s degree in management, engineering, telecom or a related discipline required. Bachelor's degree preferred.
  • PMP – Project Management Professional Certification a plus
  • Green or Black Belt in Six Sigma Management a plus

Experience:

  • 5+ years of experience in the wireless telecom industry including experience in Data / Telecom power, design, construction, leadership and management.
  • Construction Management skills including:
    • AutoCAD/design review, and implementation, HVAC, emergency generators, National Electrical Code requirements
    • Environmental requirements including hazardous material, spill prevention, and other regulatory guidelines.
    • General building maintenance, vendor maintenance
  • Power skills: DC power systems, AC UPS systems, and corresponding distribution systems, troubleshooting
  • Knowledge of Mission Critical, Tier IV Data Center design/engineering, construction and operation
  • Proficient in office computer applications: Excel, Word, PowerPoint, and Access
  • Solid, proactive & proven Project Management and Financial Management skills 
  • Strong leadership, communication, analytical, decision making, and organizational skills.
  • Ability to work flexible hours and support night or weekend work 26% to 50% of work hours
  • Overnight travel will be required 26% to 50% of work hours
  • Valid Driver’s license in good standing is required


Equal Employment Opportunity
  • Verizon is a Federal Contractor
  • Verizon requests veteran priority referrals
  • Verizon is an equal opportunity and affirmative action employer M/F/Disability/Vet.


  • Verizon is a Federal Contractor
  • Verizon requests veteran priority referrals
  • Verizon is an equal opportunity and affirmative action employer M/F/Disability/Vet.




Job ID: 349121